PalniES delivers comprehensive construction packages that give contractors everything they need to execute your telecom project with precision from day one. Our packages combine technical accuracy, detailed documentation, and field-ready specifications, minimizing delays, reducing errors, and ensuring your network is built exactly as designed.
PalniES turns engineering designs into actionable, field-ready construction packages that crews can execute with confidence. By combining decades of experience with rigorous technical precision, we eliminate ambiguity, reduce delays, and ensure material and design accuracy from procurement through installation. Our packages support fiber builds, wireless deployments, make-ready projects, and network upgrades, delivering coordinated documentation that aligns design intent with field reality. Each package includes:
Fully engineered construction sheets and technical drawings
Traffic control plans and cross-sectional detailing
Bill of Materials (BOM) and Bill of Quantities (BOQ) preparation
Fiber maps, splice diagrams, and single-line schematics
Clear instructions, accurate BOMs, and constructable work sequences
Validated bills of materials that reduce waste and prevent shortages
Sequenced packages that support phased deployment and crew scheduling
PalniES provides end-to-end construction package capabilities that ensure every project is field-ready and fully coordinated. From fiber build packages and make-ready documentation to work order generation, detailed BOM development, installation specifications, and GIS-linked deliverables, our solutions streamline construction, reduce errors, and align design intent with real-world execution. Every package is engineered for accuracy, compliance, and seamless deployment.
Complete OSP and ISP fiber construction documentation including material lists, splice assignments, installation specs, and phasing plans for FTTH/FTTP deployments.
Structured work orders organized by route segment, splice location, or construction phase with crew assignments and completion tracking support.
Accurate, itemized material lists with part numbers, quantities, and specifications tied to design drawings and construction locations.
Pole-by-pole make-ready work orders with transfer sequences, riser diagrams, and coordination documentation for utility attachment projects.
Detailed construction methods, safety requirements, quality standards, and material installation guidelines tailored to project scope and local codes.
Geospatially referenced construction packages with map-based work order views, GPS coordinates, and as-built update workflows.
A structured approach from requirements to construction-ready deliverables
Review engineering designs, material specs, and project requirements
Generate accurate material lists, verify part numbers, validate quantities
Organize tasks by phase, route, or crew with clear sequencing
Compile drawings, specs, BOMs, and instructions into work packages
Issue construction-ready packages with ongoing field coordination support
Review engineering designs, material specs, and project requirements
Generate accurate material lists, verify part numbers, validate quantities
Organize tasks by phase, route, or crew with clear sequencing
Compile drawings, specs, BOMs, and instructions into work packages
Issue construction-ready packages with ongoing field coordination support
Construction management and documentation systems
PalniES construction packages help clients turn complex network projects into efficient, executable workflows. By providing fully coordinated documentation, our clients can streamline contractor mobilization, reduce material waste and shortages, manage large-scale fiber deployments, and coordinate make-ready workflows with confidence. Each package ensures field crews have clear, actionable guidance, allowing projects to stay on schedule, on budget, and aligned with design intent.
Ready-to-issue construction packages that eliminate pre-construction delays, reduce RFIs, and enable faster crew deployment with clear, complete documentation.
Accurate BOMs validated against designs prevent over-ordering, reduce inventory costs, and eliminate mid-project material shortages that delay construction.
Phased work packages for multi-year FTTH builds support controlled rollouts, crew coordination, and as-built tracking across thousands of route miles.
Pole-by-pole make-ready packages with transfer sequences and riser diagrams streamline utility coordination and reduce construction conflicts.